Technical guides
Clear explanations of concepts, methods, standards and measurements for engineers and technicians.
- Antennas 52
- Confined spaces 52
- Dielectric materials 54
- Dielectric oils 61
- Electric vehicles 52
- Electrical safety and PPE 52
- Electronic instrumentation 52
- EMC/EMI 53
- Environmental testing 53
- Grounding 54
- Industrial electrical systems 52
- Insulation and high voltage 61
- Metrology and calibration 59
- Oscilloscopes 53
- Power quality and Grid Code 61
- RF and microwave 61
- Solar energy 52
- Temperature and pressure 52
- Thermography 53
- Transformers 55
- Troubleshooting 52
- Vibration 52
- Wireless communications 52
- How is a thermographic inspection documented?
A thermographic inspection is documented by recording equipment identification, load and ambient conditions, camera parameters, thermal and visible images, analysis, severity and recommendation.
- How is a thermographic inspection of electrical panels prepared?
A thermographic inspection of panels is prepared by defining the scope, reviewing load and access conditions, setting up the camera and coordinating with qualified personnel the opening of panels or the use of inspection windows.
- How is a thermographic inspection of motors performed?
A thermographic inspection of motors is done with the motor at steady state and under load, checking bearings, frame, terminal box and coupling, and comparing with identical machines or with previous shots.
- How is a time-domain measurement made with a VNA?
The frequency response is measured and the analyzer converts it to the time domain with an inverse transform; the result shows where each reflection is and how large it is along a line or device.
- How Is a Transfer Between the Normal Source and an Emergency Generator Planned?
A transfer between the normal source and an emergency generator is planned by defining which loads to back up, how the changeover will be made without backfeeding the utility, how the generator starts and picks up load, and how the protection is coordinated.
- How Is a Transformer Prepared for Out-of-Service Electrical Testing?
For out-of-service electrical testing, the transformer is de-energized, isolated from all its sources and loads, verified free of voltage and grounded, and the external connections to its bushings are removed, in addition to recording conditions and reference data.
- How is a transformer vector group verified in the field?
The vector group is verified in the field by applying a reduced three-phase voltage to the high-voltage side, bonding a high-voltage terminal to a low-voltage terminal and measuring the voltages between the remaining terminals, or with an instrument that directly measures ratio and phase angle.
- How Is a Transformer Winding Resistance Test Performed?
The winding resistance test injects direct current into each winding and measures the voltage drop to calculate its resistance, which makes it possible to detect loose connections, broken strands and tap changer problems.
- How is a transformer’s sampling interval determined?
A transformer's sampling interval is set according to its importance, load, age, gas history and the trend of the results: the faster the indicators change or the more critical the equipment, the shorter it must be.
- How is a TRL calibration performed and when is it used?
A direct connection, a reflect and one or more lines of known length are measured; since only the line needs a precise definition, the method is highly accurate in media where good standards do not exist, such as waveguide, microstrip or wafers.
- How is a vibration alarm level defined?
It is defined by combining severity criteria by machine type with the machine's own baseline, setting at least one alert level and one danger level, which are adjusted with experience to limit false alarms.
- How is a vibration monitoring route set up?
You define which machines to measure, at which points and in which directions, with which parameters and how often, so that each round repeats the same measurements under the same conditions and the data are comparable over time.
- How is a voltage detector checked before use?
A voltage detector is checked before each use by confirming its physical condition, its self-test if it has one and its response on a known source, to be sure that it would indicate voltage if voltage were present.
- How is a wind turbine monitored?
A wind turbine is monitored by measuring vibration at its bearings, gearbox and main components, with fixed sensors and analysis that takes into account that speed and load change constantly with the wind.
- How is a wireless channel characterized?
Characterizing a wireless channel means measuring how propagation behaves between transmitter and receiver (loss, path delays, variation over time and noise) in order to know what modulation, antenna or margin the link requires.
- How Is a Wireless Module Integrated into a Product?
Integrating a wireless module into a product requires care with the antenna, power supply, board layout and regulation, because most performance failures originate in the integration and not in the module.
- How Is a Wireless Network Deployed in a Plant with Metal Structures?
To deploy a wireless network in a plant with metal structures, start from a measured site survey, not just from drawings, because metal reflects, blocks and changes propagation in ways that are hard to predict.
- How is a work crew prepared for substation switching?
A work crew is prepared for substation switching by defining roles and authority, reviewing the procedure and diagrams, checking equipment and protection, agreeing on communication and planning for emergencies before entering the site.
- How is abnormal current draw on a circuit board measured?
Abnormal current draw on a board is measured with an ammeter in series with the power supply, or with a shunt resistor and oscilloscope, and compared with the draw of a healthy board.
- How is acceleration measured on a test bench?
On a test bench, acceleration is measured with an accelerometer rigidly attached to the part or to the test table, measuring both control and response, because acceleration is directly linked to the force the specimen undergoes.
- How is active thermography performed?
Active thermography applies an external thermal stimulus to the object and observes how its surface responds; internal defects alter the heat flow and show up as areas with different behavior.
- How is adjacent channel power measured?
Adjacent channel power is measured by integrating the power in the transmitter's channel and in the neighboring channels with an analyzer, and it is expressed as the ratio between the two; it indicates how much energy spills outside the assigned channel.
- How Is Aged Oil Regenerated?
Aged oil is regenerated by passing it through an adsorbent medium, such as Fuller's earth or activated alumina, that retains acids and polar compounds; it is then re-inhibited to restore its protection against oxidation.
- How is air bled from a hydraulic test circuit?
Air is bled by filling the circuit from the lowest point, venting at the high points and moving the fluid until it comes out free of bubbles, because air is compressible and makes pressure tests slow and unstable.
- How Is an Adjustment Performed After a Calibration?
An adjustment after calibration is made by modifying the instrument so that its indication moves closer to the reference value. It must always be preceded by recording the error found and followed by a verification of the result.
- How is an analog sensor validated on the bench?
Known, traceable stimuli are applied to the sensor across its full range, its output is measured with a more accurate instrument and compared with the expected response to determine error, linearity, hysteresis, repeatability and stability.
- How is an antenna array designed?
The radiating element, its spacing and the amplitude and phase excitation of each element are chosen. The pattern of the whole is the element pattern multiplied by the array factor, which depends on the geometry and on those excitations.
- How Is an Antenna Installed on a Tower Verified?
An antenna installed on a tower is verified by using a cable and antenna analyzer to measure the return loss and distance to fault of the complete line, and by checking the antenna's orientation, tilt and any mechanical damage.
- How Is an Antenna Integrated into a Product Designed?
The design of an antenna integrated into a product starts from the available space and materials: the band is defined, a compact type is chosen, it is simulated with the actual housing and circuit, and it is adjusted with measurements on the prototype.
- How is an antenna tuned to a target frequency?
The reflection of the antenna is measured with a network analyzer, the resonant frequency is located and its electrical length is modified: shortening it raises the resonance and lengthening it lowers it. Corrections are made in small steps with the antenna installed.