Technical guides
Clear explanations of concepts, methods, standards and measurements for engineers and technicians.
- Antennas 52
- Confined spaces 52
- Dielectric materials 54
- Dielectric oils 61
- Electric vehicles 52
- Electrical safety and PPE 52
- Electronic instrumentation 52
- EMC/EMI 53
- Environmental testing 53
- Grounding 54
- Industrial electrical systems 52
- Insulation and high voltage 61
- Metrology and calibration 59
- Oscilloscopes 53
- Power quality and Grid Code 61
- RF and microwave 61
- Solar energy 52
- Temperature and pressure 52
- Thermography 53
- Transformers 55
- Troubleshooting 52
- Vibration 52
- Wireless communications 52
- How Is a Power Divider Evaluated?
A network analyzer is used to measure insertion loss, amplitude and phase balance between outputs, isolation between them and the match at each port, always terminating the ports not being measured with loads.
- How is a power factor test on a transformer interpreted?
A power factor test measures the dielectric losses and capacitance of the insulation between windings and to ground; it is interpreted by comparing with previous values and with other phases and similar units, correcting for temperature, and not from an isolated number.
- How is a power input filtered?
A filter is placed at the point of entry, with a combination of line-to-line capacitors, capacitors to ground and a common-mode choke, and it is mounted so that its input wiring stays separate from its output wiring and its ground has a short, low-impedance connection.
- How is a power semiconductor tested out of circuit?
A power semiconductor is tested out of circuit with the multimeter’s diode mode and, for a more complete check, with a curve tracer that shows its behavior under voltage.
- How is a pressure decay leak test performed?
The test pressurizes the system, isolates it and monitors how much the pressure falls over a defined time, carefully distinguishing a drop caused by a real leak from one caused by temperature changes.
- How is a pressure gauge calibrated with a deadweight tester?
A deadweight tester generates a known pressure with a piston and cylinder loaded with calibrated masses; the gauge is connected to the same circuit and its reading is compared with that pressure.
- How is a pressure transmitter verified at its installation site?
It is verified by isolating the transmitter from the process, applying known pressures with a source and a reference standard, and comparing the applied pressure with the transmitter's output, normally the loop current, at several points across the range.
- How is a radiation pattern measured in an anechoic chamber?
The antenna under test is mounted on a positioner that rotates it inside the chamber, it is illuminated by a probe antenna at far-field distance, and the received signal is recorded as a function of angle with a network analyzer or a receiver.
- How Is a Repeatability and Reproducibility Study Done?
A repeatability and reproducibility (R&R) study measures representative parts several times with several operators and separates the variation of the measurement system from the real variation between parts, to show whether the system is adequate.
- How is a resistance thermometer calibrated by comparison?
It is calibrated by comparing the resistance thermometer's readings with those of a reference standard, both immersed in a stable isothermal medium, at several temperatures spread across the range of use.
- How is a rotor balanced in the field?
The 1X vibration is measured with its phase, a known trial mass is added at a defined angle, the change is measured, and from it the correction mass and angle are calculated, then installed and verified.
- How is a sample taken at different levels of the space?
A sample is taken at different levels by lowering a probe with a hose, or moving the detector, to the top, middle and bottom of the space, waiting at each point for the reading to stabilize, because gases stratify according to their density.
- How is a single-line diagram of an existing plant surveyed?
It is surveyed by walking the installation from the service entrance toward the loads, recording each piece of equipment with its nameplate data and physically verifying each connection, rather than relying on old drawings.
- How is a site assessed for rooftop panel installation?
Assessing a roof for panels consists of verifying three things: that the structure can bear the weight and the wind loads, that the solar resource is usable without significant shading, and that the building's electrical installation can accept the system.
- How is a solid sample prepared for measuring dielectric properties?
A solid sample for measuring dielectric properties must have flat, parallel faces, a uniform and known thickness, a clean surface and a controlled moisture state, because any geometric defect becomes a permittivity error.
- How is a spectrum survey performed to detect interference?
A spectrum survey to detect interference consists of observing the band of interest with an analyzer, identifying the signals present, comparing them with those expected and locating the origin of those that should not be there.
- How is a start-up test performed on electronic equipment?
The equipment is powered under defined conditions, its power-up sequence is observed with high-speed recording instruments, and inrush current, internal voltages, timing and final state are verified, repeating under various conditions.
- How is a step voltage test performed on insulation?
A step voltage test applies a series of increasing DC voltages to the insulation, holding each one for the same time, and compares the insulation resistance at each step: sound insulation keeps its resistance almost constant, while defective insulation shows the resistance falling as the voltage rises.
- How is a string sized for the inverter voltage?
A string is sized for the inverter voltage by choosing a number of modules in series such that the minimum voltage in hot conditions stays within the maximum power point tracking range and the maximum voltage in cold conditions does not exceed the maximum input voltage.
- How is a substation protected from transferred voltages?
By preventing a metallic conductor from connecting the substation's elevated-potential zone with a remote point, through equipotential bonding, insulation and separation of the systems that leave the site.
- How is a substation restarted after a long planned outage?
Restarting a substation after a long planned outage requires first verifying that it is fit to be energized, removing in an orderly way everything placed for the work, and energizing in stages, without load, before loading it gradually.
- How Is a Substrate Selected for a Printed Antenna?
For a printed antenna, the substrate is selected according to its permittivity, loss tangent, thickness, stability with temperature and moisture, and manufacturing tolerances, because these parameters set the bandwidth, efficiency and frequency.
- How is a suspect capacitor checked?
A suspect capacitor is checked by visual inspection and by measuring capacitance and equivalent series resistance, ideally out of circuit and discharged, because an ordinary multimeter does not detect all defects.
- How is a suspect winding checked?
A suspect winding is checked by comparing its resistance, its insulation to ground and its balance between phases with reference values, always with the equipment de-energized and disconnected.
- How is a sweep frequency response analysis (SFRA) performed?
Sweep frequency response analysis (SFRA) injects a low-voltage, variable-frequency signal into one transformer terminal and measures the response at another, producing a fingerprint that is compared with references and reveals mechanical deformation.
- How is a switching power supply tested?
It is tested by operating it under controlled input and load conditions and measuring its output: regulation, ripple, transient response, efficiency, protections and start-up behavior.
- How is a tank cleaned and gas-freed before entry?
To clean and gas-free a tank before entry, it is emptied and isolated, residues are removed, vapors are displaced with ventilation, steam, water or inert gas depending on the product, and measurements confirm that the atmosphere is acceptable, bearing in mind that residues may keep emitting.
- How is a tank or metal structure grounded?
It is connected with bonding conductors to the ground grid to drain static charges and divert lightning and fault currents, ensuring continuity between all metal parts and compatibility with cathodic protection if present.
- How is a telecommunications tower grounded?
With an air termination and down-conductor system that carries the discharge to a low-impedance electrode, equipotential bonding of all legs, antennas, cables and shelters, and surge protection on every line entering the site.
- How is a test fixture de-embedded?
The fixture is measured or modeled separately and its effect is removed mathematically from the measurement of the assembly, so that the result corresponds to the device at its own reference plane.