Technical guides
Clear explanations of concepts, methods, standards and measurements for engineers and technicians.
- Antennas 52
- Confined spaces 52
- Dielectric materials 54
- Dielectric oils 61
- Electric vehicles 52
- Electrical safety and PPE 52
- Electronic instrumentation 52
- EMC/EMI 53
- Environmental testing 53
- Grounding 54
- Industrial electrical systems 52
- Insulation and high voltage 61
- Metrology and calibration 59
- Oscilloscopes 53
- Power quality and Grid Code 61
- RF and microwave 61
- Solar energy 52
- Temperature and pressure 52
- Thermography 53
- Transformers 55
- Troubleshooting 52
- Vibration 52
- Wireless communications 52
- How a pressure vessel is tested before operation
It undergoes a pressure test, normally hydrostatic, under an approved procedure, with inspection for leaks and deformation and recording of the results. The test must be done by qualified personnel in accordance with the design code.
- How a sample is conditioned before a climatic test
The sample is brought to a known, repeatable initial state, normally at stable ambient temperature and humidity for a sufficient time, with initial measurements recorded, so that the result depends on the test and not on its previous history.
- How a sample is monitored during a long-duration test
The environmental conditions and the behavior of the sample are recorded continuously with calibrated instruments, alarms and a response plan, in order to detect a failure the moment it occurs and understand how it developed.
- How an environmental test profile is defined for a product
The starting point is the real environment the product will see during its life. The most severe or damaging events are translated into test conditions, and levels, ramps and duration are justified with the standard, the customer requirement or measured data.
- How are channels planned to avoid interference?
Channels are planned to avoid interference by assigning each transmitter a frequency that does not overlap with those of its neighbors, reusing frequencies only at sufficient distances or with sufficient isolation, and then verifying with measurements.
- How are energy production and its variability measured?
The energy production of a solar plant is measured with energy meters at the generation and interconnection points, and its variability is analyzed by comparing time series normalized for irradiation, because the solar resource changes with clouds, seasons and years.
- How Are Environmental Effects Compensated for in a Calibration?
Environmental effects are compensated for by controlling the conditions, applying corrections calculated from known models or coefficients or, if that is not possible, including their contribution in the calibration uncertainty.
- How are intermittent failures recorded during an environmental test?
An intermittent failure is recorded by monitoring the product's function continuously, with sufficient time resolution, while the environment changes, and by storing each event with a timestamp.
- How Are Loads Balanced Between Phases in a Panel?
Load balancing between phases consists of measuring the current in each phase over a representative operating cycle and redistributing single-phase circuits so that the three phases end up as similar as possible.
- How are maximum demand and load factor measured?
Maximum demand is the highest average power calculated over successive demand intervals, and load factor is the ratio of average demand to maximum demand for the period.
- How are non-electrical personnel trained in basic risks?
Non-electrical personnel are not taught to work on installations but to recognize the hazard, stay away from it and report it: what electricity does to the body, which signs indicate risk and which tasks are never theirs to do.
- How are out-of-tolerance instruments managed?
An out-of-tolerance instrument is managed by removing it from use, assessing which measurements it may have affected since its last good verification, deciding whether to adjust, repair or retire it, and reviewing why it deviated.
- How are power, control and communications grounds bonded together?
Power, control and communications grounds are joined through a common grounding system and short equipotential bonds, so that there are no potential differences between them, and not through independent, unconnected grounds.
- How Are Results Compared Between Laboratories?
Results between laboratories are compared by measuring the same item or material with the same protocol and evaluating whether the differences are compatible with the stated uncertainties, normally through proficiency testing or interlaboratory comparisons.
- How are slow variables logged over several days?
They are logged with a data acquisition system or recorder set to a low sampling rate, with suitable filtering, a reliable timestamp, backed-up storage and an uninterruptible power supply, verifying the setup before leaving it unattended.
- How are temperature and humidity measured for heat stress inside the space?
Temperature and humidity for heat stress inside a space are measured at the work site with an index that combines temperature, humidity, radiation and air movement, such as WBGT, together with the workload and the worker's clothing.
- How are the acceptance criteria for an insulation test defined?
The acceptance criteria for an insulation test are defined before measuring, by combining the requirements of the standard or manufacturer, the equipment's history and the test conditions, and they are documented together with the method.
- How Are the Capacitance and Dissipation Factor of a Cable Measured?
The capacitance and dissipation factor of a cable are measured by applying AC voltage between conductor and shield with a bridge or digital instrument that separates the capacitive current from the loss current.
- How are the cells in a pack balanced?
Cells are balanced by equalizing their state of charge: the passive method dissipates energy from the highest cells in resistors, and the active method transfers it between cells.
- How are two shafts aligned with a laser?
A laser emitter and receiver are attached to the two shafts, the shafts are rotated, and the parallel offset and angle are measured at the coupling plane; from those values the vertical and horizontal corrections for the movable machine are calculated.
- How are vehicle batteries reused in stationary storage?
Vehicle batteries are reused in stationary storage after assessing their condition, sorting modules of similar performance and reconfiguring them with a new management system, converter and protections, in applications that demand less power.
- How do you build an automated test bench?
An automated test bench is built by defining what is measured and against what criterion, choosing instruments with a programmable interface, connecting them to the unit under test through a fixture and switching, and controlling it all with software that runs the sequence and records the results.
- How do you capture a single, sporadic event?
Configure the oscilloscope to arm a trigger that identifies the event, with enough sample rate and memory to see its detail and context, and leave it waiting in normal or single mode until it occurs.
- How Do You Choose a Standard to Calibrate an Instrument?
A standard is chosen so that its uncertainty is clearly smaller than that of the instrument being calibrated, it covers the required range and quantity, it is compatible with the method and it has a current traceable calibration.
- How Do You Choose an Antenna for Industrial Telemetry?
For industrial telemetry, an antenna is chosen based on the radio band, the link geometry, the environment and the type of installation: normally an omnidirectional antenna for a hub and directional antennas for fixed links, with attention to the link budget.
- How do you choose the right measurement range?
The right range is the smallest one that contains the signal without saturating, because an instrument's resolution and accuracy are specified relative to the range and improve when most of it is used.
- How do you compensate a passive probe?
Connect the probe to the oscilloscope's square-wave calibration signal and adjust the probe's compensation capacitor until the edges of the wave look straight, with no rounding or overshoot.
- How Do You Connect Two Transformers in Parallel?
Two transformers can be connected in parallel if they match in voltage, turns ratio, phase displacement (vector group) and phase sequence, and have similar percent impedances so that they share the load properly.
- How Do You Correct Insulation Resistance for Temperature?
Insulation resistance falls as temperature rises, so it is corrected by multiplying the reading by a coefficient that brings it to a common reference temperature.
- How do you debug a serial bus with decoding?
To debug a serial bus with decoding, the oscilloscope interprets the signal levels as bits according to the protocol and displays addresses and data over the waveform, which makes it possible to relate the content to the electrical signal.