How is a suspect winding checked?

A suspect winding is checked by comparing its resistance, its insulation to ground and its balance between phases with reference values, always with the equipment de-energized and disconnected.

What can fail in a winding

A winding can open, short between turns, lose insulation to the core or frame, or become unbalanced with respect to the other phases. Each defect requires a different test, because no single test detects everything.

Basic tests

  • Winding continuity and resistance: an infinite value indicates an open circuit. In a three-phase motor, the three phases must have very similar resistances; a noticeable difference suggests a faulty connection or shorted turns.
  • Insulation resistance to ground: this is measured with a high-voltage DC instrument, the megohmmeter. A low value indicates moisture, contamination or insulation deterioration.
  • Polarization index and trend: comparing readings taken at different times helps distinguish surface moisture from deeper deterioration.
  • Turn-to-turn test (impulse or surge): applies voltage pulses and compares the response of each phase; it reveals turn-to-turn shorts that resistance does not detect, because a single shorted turn barely changes the total resistance.

How to do it in order

  1. De-energize, lock out and verify the absence of voltage.
  2. Disconnect the winding from the rest of the circuit and from the drive, if there is one.
  3. Measure the resistance of each phase and compare the phases with each other and with previous data.
  4. Measure insulation to ground and record the temperature, because insulation varies with it.
  5. If shorted turns are suspected, apply a specific comparative test.

How to interpret the result

A single reading is worth little; the trend over time and the comparison between phases tell you more. Acceptable insulation does not rule out a turn-to-turn short, and neither does balanced resistance. Insulation tests apply high voltages and can damage an already weakened winding if done without judgment.

This work involves electrical risk; it must be carried out by qualified personnel in accordance with applicable regulations.