General idea
On-site verification means checking the transmitter without fully removing it, in its working position and with the actual wiring. A known pressure is applied at its process connection and its output is read. If the output agrees with the expected value within tolerance, the transmitter is in good condition. The advantage is that this includes the effect of the actual installation; the limitation is that the environment and the test equipment are less controlled than in a laboratory.
Before you start
- Obtain the plant’s authorizations and work permits and notify operations: the loop may be tied to control or protection functions.
- Place the loop in manual mode or inhibit automatic actions that depend on the signal.
- Isolate the transmitter from the process with the corresponding valves and release the pressure safely.
Verification sequence
- Record the initial condition: configured range, units, damping and the reading with the process isolated, at reference pressure.
- Connect the pressure source and the standard at the test port, with the appropriate fittings.
- Check the zero at the corresponding reference pressure: vented to atmosphere for a gauge transmitter, or vacuum for an absolute one.
- Apply pressures distributed across the range, ascending and descending, waiting for stabilization at each point.
- Measure the loop output with a current meter of suitable accuracy, or read the digital value if the protocol allows it, and compare with the expected value.
- If there are out-of-tolerance deviations, record them and decide on a zero or span adjustment, repeating the verification afterwards.
- Return the transmitter to the process and put the loop back in its normal mode.
Points to watch
- The mounting position and the liquid column in the impulse lines shift the zero and must be compensated for or taken into account.
- The pressure standard must be clearly better than the transmitter’s tolerance.
- A zero adjustment does not correct a span error, nor the other way around.
What to check first
Before adjusting, confirm that the connections are not leaking and that there is no trapped air or condensate in the lines. Many apparent deviations come from the installation and not from the transmitter.
Safety
Work involving pressure, hazardous processes or electrical installations in classified areas must be carried out by qualified personnel, following the applicable regulations and procedures.