AC or DC for an Applied Voltage Test?

AC voltage reproduces service stress but requires a source that can supply the capacitive current; DC requires a small source and measures leakage, although it distributes the field differently.

How the stress is distributed

With AC voltage, the field in composite insulation is distributed according to the permittivities of each material, just as in service. With DC, it is distributed according to the resistivities, which vary with temperature, humidity and aging. A defect that concentrates the field under AC can go unnoticed under DC, and vice versa.

AC

  • Advantage: it is the test most representative of actual stress, especially for equipment that operates on AC.
  • Limitation: the test object acts as a capacitor and demands reactive current, so the source must be large for objects with high capacitance, such as long cables or generators. Resonance can be used to reduce the power required.
  • Effect: a breakdown releases considerable energy.

DC

  • Advantage: the current after charging is very small, so the source is compact and lightweight. It allows leakage current to be measured during the test.
  • Limitations: the DC value equivalent to an AC test is higher than the AC peak value, and there is no exact equivalence. It can leave space charge in solid insulation and requires careful discharge of the equipment at the end.

How to decide

  1. What the equipment standard or the purchase specification prescribes.
  2. The capacitance of the test object and the source available.
  3. The type of insulation: extruded solids usually favor AC; rotating machine windings are frequently tested with DC because of the ease of the equipment.
  4. The objective: withstand (pass or fail) or diagnosis by leakage.

When the comparison does not apply

One must not be substituted for the other without normative backing, because the acceptance values of one do not carry over to the other with a simple factor.

These activities involve hazardous voltages: they must be carried out by qualified, authorized personnel, following the applicable regulations and the facility’s lockout and grounding procedures.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer