24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

What is AC charging versus DC charging?

In alternating current charging, the vehicle receives AC and its onboard charger converts it to DC; in direct current charging, the charger is outside the vehicle and delivers DC directly to the battery. What changes is where the conversion takes place and, with it, the power possible.

Where the conversion takes place

The battery can only be charged with direct current. With AC, the charging station (supply equipment) delivers alternating current and supervises safety, while the onboard charger handles rectification and charge control. With DC, the station contains the power converter and communicates with the vehicle’s BMS to set the voltage and current.

Why AC is slower

The onboard charger has to fit in the vehicle, with limited weight, volume and cooling, so its power is moderate. AC power is limited both by that charger and by the capacity of the electrical installation. DC does not have that restriction, because the larger converter is in the station.

Practical differences

  • An AC station is simpler and lower in cost; a DC station requires power electronics, cooling and greater electrical infrastructure.
  • DC allows faster charging, useful on long trips; AC suits long charging sessions at home or in parking lots.
  • Connectors and communication protocols can differ by region and type of charging.
  • DC fast charging reduces its power as the battery fills and at extreme temperatures.

What an engineer sees in the field

With AC, the actual power depends on the lowest of what the station offers, what the cable allows and what the vehicle’s charger accepts. With DC, it depends on what the BMS allows at each moment. If the power is lower than expected, first check the limit declared by each element in the chain.

When each one makes sense

AC is usually sufficient when the vehicle stays parked for several hours. DC is justified when time is critical. The choice also depends on the power available at the site.

Notice

Charging installations operate with hazardous voltages and currents. Their installation and inspection must be carried out by qualified persons, in accordance with the applicable electrical regulations.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer