Its objective
Unlike performance qualification tests, this standard focuses on protecting people and property. A module exposed to the sun produces DC voltage as long as there is light, cannot be switched off, and is installed in places with humidity, heat and stress. The standard sets requirements to make that condition tolerable.
Two complementary parts
One part covers construction requirements: materials, insulation, spacings, and protection of live parts and of the junction box. The other defines the tests that verify those requirements on samples. Together they make it possible to evaluate both the design and its actual behavior under test.
What risks it considers
- Electric shock: insulation, clearances and creepage distances, continuity of accessible metal parts.
- Fire: behavior of the materials and of the module when exposed to an ignition source, as well as excessive heating in components such as the junction box and the diodes.
- Mechanical stress: robustness against loads and against damage that could expose live parts.
What an engineer sees in practice
Conformity appears as a certificate issued after tests at a laboratory, and it identifies a design with an application class. The class indicates the type of location and access for which the module is suitable, which must match the actual installation. Checking that the certification corresponds to the exact model installed is part of acceptance.
Difference from design qualification
A module can maintain its power after accelerated aging and still have a safety weakness, for example in the insulation of the junction box. That is why the two evaluations are requested together and do not replace each other.
Notice
This guide describes only the general scope of the standard. The requirements, the tests and their order change between editions, so consult the current edition and the one required by the contract or the authority. Any work on an energized photovoltaic array, with DC voltages that are not interrupted by opening a disconnect switch on the AC side, must be carried out by qualified personnel in accordance with the applicable electrical safety regulations.