24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

Slow charging or fast charging?

Slow AC charging is suitable when the vehicle is parked for many hours and a lower installation cost is sought, and fast DC charging when the stop is short, in exchange for higher power and greater thermal demands.

The difference is where the conversion takes place

In AC charging, the station only supplies grid power to the vehicle, with control and protection, and the vehicle’s onboard charger converts it to DC. Its power is limited by the size and cooling of that charger. In DC fast charging, the conversion is done in the station, which can be much larger, and it delivers DC directly to the battery under the control of the vehicle’s management system.

Electrical consequences

  • Current and heat: Joule losses grow with the square of the current. Fast charging demands connectors, cables and cells able to dissipate much more heat, and sometimes cooled cables.
  • Installation: a fast station needs a high-capacity service entrance and transformer, whereas a slow one can be fed from a conventional installation.
  • Grid: concentrated power produces demand peaks that are difficult to manage.

Consequences for the battery

The battery does not accept constant power. The charge rate decreases as the state of charge rises and when the temperature is very low or very high. At high rates, the risk of lithium plating on the anode increases, especially with a cold battery; this is why vehicles preheat or limit the current. Routine fast charging can accelerate aging compared with slow charging, although the effect depends heavily on the cell design and thermal management.

How to choose

There is no absolute best option. If the vehicle is parked overnight, slow charging covers the need with less demand on the installation and the battery. Fast charging is justified on long routes or in fleets with little downtime. In practice, many users combine both.

Charging equipment must be installed and commissioned by qualified people under the applicable electrical regulations.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer