What is needed from an emissions site
A radiated emissions test site must offer a conductive, reflective ground plane and an environment where the only signals present are those of the equipment, with no other unwanted reflections. It is validated by a site attenuation measurement, which verifies that its behavior matches the theoretical one.
Open-area test site
- Clear land with a metal plane on the ground and no reflective structures nearby.
- It is faithful to the theoretical model at low frequency, because there are no walls to interfere.
- It is exposed to radio, television and cellular transmitters and to any nearby source, so much of the band is unusable or requires discrimination.
- It depends on the weather, and the equipment stays outdoors or under a non-metallic cover.
Semi-anechoic chamber
- A shielded enclosure with absorbers on the walls and ceiling and a reflective metal floor.
- It isolates from the outside environment, which makes it possible to measure low levels at any time.
- Its quality depends on the absorbers: at low frequency they are less effective and require volume, so the distance and the size of the equipment constrain the site.
- It requires investment and maintenance, and it must be validated periodically.
How to decide
| Criterion | Open area | Semi-anechoic |
|---|---|---|
| Ambient noise | High, variable | Isolated |
| Repeatability | Depends on the day | High |
| Large equipment | More space available | Limited by the enclosure |
| Operating cost | Low if the land exists | High investment |
In an urban area, ambient noise usually makes an open-area site impractical across much of the spectrum, which is why the chamber is the most common solution. The standards accept both if the site is validated, and the results should in principle be comparable.