A grid does not fail all at once
A ground grid is a network of conductors joined to each other and to the equipment. Its safety function depends on every joint keeping a very low resistance. Degradation is usually local and progressive, and because there are parallel paths, the grid can appear to go on working until a fault occurs and the current demands precisely the damaged joint.
Loss mechanisms
- Corrosion of the conductor or joint. It depends on soil chemistry, moisture, salts and aeration.
- Galvanic couple. Two dissimilar metals in contact within an electrolyte, such as moist soil, form a cell. The less noble one corrodes. This is critical in joints between copper and steel or aluminum.
- Poorly made joints. A weld with poor fusion or an under-tightened mechanical connector starts out with high resistance and gets worse over time.
- Thermal cycling and vibration. Mechanical connectors work loose; heating from earlier fault currents can leave hidden damage.
- Mechanical damage. Excavation, later civil works or conductor theft cut paths without anyone recording it.
How it is detected
Continuity is verified by measuring the resistance between points on the grid with a low-resistance instrument that injects an appreciable current, and comparing the value with other equivalent points and with previous measurements. A clearly higher value on one section points to a suspect joint. A ground resistance measurement alone is not enough, because it can come out acceptable even with disconnected sections.
How to interpret the result
What is useful is the trend. An isolated point with a high value warrants direct inspection of the joint, normally by excavating. Several points rising evenly suggest general corrosion or a change in the soil. It is advisable to keep a record of test points, values and dates so that each measurement is compared against a baseline.
How it is prevented
Choose compatible materials, use exothermic welded joints or connectors designed for burial, protect air-to-soil transitions, leave inspection points accessible and document the actual location of the network. Measurements and work in energized electrical installations must be done by qualified personnel, following the applicable regulations and the site’s safety procedures.