Why does a hot spot not show up in a low-load inspection?

Because the heating of a defective connection grows with the square of the current; at low load, the power dissipated is so low that the temperature difference stays below what can be distinguished from the surroundings.

Heat that depends on current

A high-resistance connection dissipates power P = I²R. If the current is halved, the power falls to a quarter. A defect that overheats at full load can be almost invisible at low current, because its temperature rise over its surroundings is minimal and stays within the noise and normal variations.

Time also counts

Components have thermal inertia. After a load change, the temperature takes time to reach equilibrium. A high load that has just started has not yet produced its final heating, and one that has just dropped still leaves residual heat. That is why the load should be stable for some time before the inspection.

What the engineer sees

A survey on a weekend or during a low-production shift shows “clean” switchboards. Weeks later, in the middle of a full shift, a connection trips an alarm. What happened was not that the defect suddenly appeared, but that the earlier inspection did not have the current needed to reveal it.

What to do

  • Schedule inspections during periods of load representative of normal or high operation.
  • Record the current in each phase at the time of the image and the approximate percentage of capacity.
  • Report a result with no findings as “no anomalies at the inspection load,” not as a guarantee of good condition.
  • Repeat at higher load on critical equipment that was inspected at very low load.

When this does not apply

If the anomaly depends on another mechanism, for example heating from magnetic losses in a no-load transformer or friction in a bearing, electrical load is not the governing variable and the logic changes. The relevant load is then that of the mechanism in question.

These inspections are performed on energized equipment and must be done by qualified personnel in accordance with applicable electrical safety regulations.