How is the insulation of medium-voltage switchgear tested?

The insulation of medium-voltage switchgear is tested with the equipment de-energized, isolated and grounded, removing or isolating sensitive components, and measuring between phases and from each phase to ground.

Which parts provide insulation

Medium-voltage switchgear has buses, insulating supports, bushings, circuit breakers and compartments. Its insulation combines solids, such as resins and porcelain, with air, and in some cases insulating gas or vacuum. The test evaluates the integrity of the whole assembly: dirt, moisture, cracks or traces of tracking paths.

Preparation

  1. De-energize completely, lock out and verify the absence of voltage at all points.
  2. Ground and discharge the conductors, and keep the ground in place until the measurement is about to be made.
  3. Remove or isolate from the buses the potential transformers, surge arresters, capacitors and electronic equipment that cannot withstand the test voltage.
  4. Clean and dry accessible insulating surfaces.

Measurements

  • Insulation resistance: each phase to ground with the other two grounded, and between phases, according to the procedure. Ambient temperature and humidity are recorded.
  • Withstand test: if the procedure requires it, with the source and level determined by the equipment standard or the manufacturer.
  • Vacuum circuit breakers: the open contact is tested to verify the integrity of the vacuum bottle, following the manufacturer’s procedure, which warns of the risks of radiation emission at elevated voltage.

How to interpret the result

Compare with the switchgear’s own history, with that of other identical sections and with the manufacturer’s instructions. A section with values noticeably lower than its neighbors reveals a local problem. If the reading drops, measure again after cleaning before concluding that there is damage.

Common mistakes

  • Leaving potential transformers or surge arresters connected, which lowers the reading or damages them.
  • Measuring with condensation on the surfaces.
  • Forgetting to discharge the buses when finished.

These activities involve hazardous voltages: they must be carried out by qualified, authorized personnel, following the applicable regulations and the facility’s lockout and grounding procedures.