The core idea
Turning equipment off is not the same as isolating it. A control switch can be operated by someone else, and a circuit that is off can still be fed from another source. Lockout/tagout imposes a physical and administrative barrier so that nobody re-energizes the equipment while someone is working on it.
General sequence
- Prepare: identify all of the equipment’s energy sources (electrical, pneumatic, hydraulic, thermal, gravitational, stored) and the isolation points. Drawings are consulted and the information is confirmed in the field.
- Notify: inform those affected and operations that the equipment will be stopped.
- Shut down the equipment using its normal stopping procedure.
- Isolate: open the disconnecting devices that separate the equipment from all of its sources.
- Lock and tag: fit each isolating device with a personal padlock and a tag identifying who it belongs to and why it is there.
- Control residual energy: discharge capacitors, release pressure, support raised loads and ground where applicable.
- Verify: try to start the equipment from the normal control to confirm that it does not run, and confirm the absence of voltage with a suitable, previously checked instrument.
Points that make the difference
- One padlock per person: each worker fits their own and only that worker removes it. When several work crews are involved, a group lockout system with clear control is used.
- The tag informs, the padlock prevents: a tag on its own is not a physical lockout.
- Backfeed: generators, UPS units, capacitors or circuits from other panels can energize parts of the equipment even when its main disconnect has been opened.
Removing the lockout
When the work is finished, tools are removed, a check is made that nobody is in the hazard zone, guards are put back, each person removes their padlock and operations is informed before re-energizing. If a padlock is left with its owner absent, the company has a special procedure for removing it; it is not simply cut off.
What to check first
Before any lockout, confirm that the procedure is written for that specific piece of equipment. Electrical activities must be carried out by qualified personnel following the applicable regulations.