Why a cable ages
Insulation degrades through several mechanisms that add up: thermal stress from current and the environment, electrical stress from voltage, moisture penetrating the insulation, mechanical damage from pulling or vibration, and chemical attack. In cables with polymeric insulation, moisture combined with an electric field can create deterioration channels known as treeing. In splices and terminations, workmanship defects tend to fail before the cable does.
What is assessed
- History: years in service, peak loads, temperatures, previous failures, splices and repairs.
- Inspection: condition of jackets, raceways and terminations, and evidence of heating, moisture or chemical attack.
- Electrical condition: measurement of insulation resistance and polarization index and, at medium voltage, dissipation factor tests, partial discharge tests or very low frequency voltage tests.
- Loading capacity: comparing actual current with the ampacity under the installation conditions.
- Criticality: the consequence of a failure defines how much uncertainty is acceptable.
What can and cannot be concluded
Remaining life is a probabilistic estimate, not a deterministic value. One cable can pass every test and fail because of a local defect, while another with signs of aging keeps running for a long time. Insulation resistance alone has low sensitivity in polymeric cables and is not enough to rule out problems. High-voltage tests can damage weakened insulation, so the method is chosen according to the age and type of cable.
How to interpret the result
The trend carries more weight than the isolated figure. Results that worsen from one campaign to the next, with the same methodology and comparable conditions, indicate accelerated degradation. A single low value, on the other hand, may be due to surface moisture or temperature. The evidence is combined to decide between keeping the feeder under surveillance, repairing sections, replacing terminations or replacing the feeder.
Final decision
Replacement carries a cost and switching risk; keeping the feeder carries a risk of failure. The criticality of the service and the availability of a backup feeder tip the balance. Tests and switching on feeders are carried out by qualified personnel, with the circuit de-energized and grounded.