Grid-tied or off-grid system with batteries?

A grid-tied system delivers energy to and receives energy from the grid and needs no batteries; an off-grid system must supply the load on its own and requires storage. The decision depends on whether a reliable grid is available at the site.

How each one works

In a grid-tied system, the inverter synchronizes with the grid voltage and delivers the energy the modules produce; consumption and export are balanced with the grid as backup. In an off-grid system, the system forms its own local grid: the inverter generates the voltage and frequency, and the battery covers the difference between generation and consumption.

What a blackout means

A standard grid-tied inverter must disconnect when the grid fails, a function known as anti-islanding, so as not to energize a line on which utility personnel may be working. For that reason, a grid-tied system without additional equipment does not supply energy during a blackout, even if the sun is shining. Backup requires batteries and an inverter capable of operating in island mode, which makes it a hybrid system.

Sizing

  • Grid-tied: sized according to consumption and to the available area or the interconnection regulations.
  • Off-grid: sized for the worst period of low irradiance, with battery autonomy, and the array must recharge the battery as well as cover the load.
  • In an off-grid system, the battery and its service life drive cost and maintenance.

When each one makes sense

Where a grid is available, grid-tied is usually simpler and more efficient, since the grid absorbs mismatches between generation and consumption. Off-grid is justified at sites with no grid or where extending it is not feasible. Hybrid is chosen when continuity during grid failures is required.

What to check first

Before choosing, survey the load profile, confirm the interconnection conditions with the grid operator and verify which loads must stay on during a failure. A poorly sized off-grid system shows low-battery disconnections; a poorly configured grid-tied system shows trips on voltage or frequency.