Corrective, preventive or predictive maintenance?

Corrective maintenance repairs after the failure, preventive maintenance intervenes by calendar or usage, and predictive maintenance intervenes according to the measured condition of the equipment; the choice depends on how it fails and how much failure costs.

Three strategies, three logics

Strategy When to intervene Basis of the decision
Corrective After the failure The failure is accepted
Preventive By time or usage The probability of failure is assumed to increase with age
Predictive When a measurement indicates deterioration The developing failure is detected

When each one makes sense

  • Corrective: for low-cost or redundant equipment, or equipment whose failure has no safety or production consequences; and when there is no way to anticipate the failure.
  • Preventive: when wear is proportional to time or usage cycles, as with filters, lubricants or belts. It does not work if failures are random, since replacing a healthy part sometimes introduces early-life failures.
  • Predictive: when deterioration is gradual and measurable and the interval between the symptom and the failure allows time to act. It requires instruments, personnel and measurement discipline.

How to choose

  1. Identify how the equipment fails and whether there is a prior warning signal.
  2. Assess the consequence: safety, environment, production and cost.
  3. Compare the cost of the strategy with the cost of the failure.
  4. Combine: a plant typically uses all three, depending on the asset.

When the answer changes

Equipment that seemed a candidate for corrective maintenance moves to preventive if its shutdown affects safety. And a predictive program that is not fed with data or does not react to alerts is worse than not having one, because it gives a false sense of control. The strategy must be reviewed against the real failure history, not against what was assumed when it was designed.

An example

On a large motor with bearings that degrade gradually, monitoring vibration and temperature makes it possible to schedule the replacement during a convenient shutdown. For an indicator lamp, on the other hand, waiting for the failure and replacing it is the most reasonable course. Between the two extremes, an air filter with a measurable pressure drop is changed according to the differential, not by date.