What does “vehicle-to-grid” mean?

“Vehicle-to-grid” refers to the ability of an electric vehicle to return energy from its battery to the electrical grid as well as charge from it, which requires a bidirectional converter, synchronization with the grid and communication with the operator.

Definition

“Vehicle-to-grid”, or V2G, is the ability of an electric vehicle to inject energy into the public grid. It is a form of bidirectional charging, and the idea is that vehicle batteries, which spend most of their time parked, act as distributed storage.

Not the same as other uses

  • Vehicle-to-load: powers an appliance from the vehicle, with no relation to the grid.
  • Vehicle-to-home: backs up a dwelling, normally isolated from the grid during an outage.
  • Vehicle-to-grid: injects into the public grid and must meet the connection requirements for generators.

What is technically required

It requires a converter that operates in both directions: on board the vehicle for AC, or in the station for DC. It must synchronize with the grid voltage and frequency, limit the distortion of the injected current and disconnect when the grid is lost, so as not to energize a section without supply. Communication between vehicle, station and operator is also needed to set limits and schedule discharge, along with metering that distinguishes the energy delivered from the energy consumed.

What services it can offer

Reducing demand peaks, providing frequency regulation, storing renewable surpluses and providing backup in emergencies. Its value depends on the vehicle being connected and holding enough energy when required.

What the technical discussion questions

Each additional cycle contributes to battery aging, and the magnitude depends on how much energy is moved and at what power. Conversion losses in both directions also count. That is why its usefulness is evaluated case by case.

Equipment that injects into the grid must be connected by qualified personnel, following the applicable regulations and interconnection requirements.