Where the surge comes from
In a solar array, surges come mainly from lightning, direct or nearby, and from switching on the grid. Lightning induces voltages in conductors through magnetic coupling: the larger the area enclosed by a wiring loop, the higher the induced voltage. That is why wiring geometry is part of the protection.
Design principles
- Reduce loops: run a string’s positive and negative conductors together, and keep the loop between power and signal cables as small as possible.
- Protection by zones: surge protective devices (SPDs) at the important entry points: the DC side of the inverter and, if the distance is large, at the combiner box and the array.
- Correct SPD selection: it must be designed for photovoltaic DC; an AC device is not suitable because direct current does not pass through zero and can sustain the arc.
- Maximum continuous operating voltage of the SPD above the maximum array voltage, including in the cold, when open-circuit voltage rises.
- Coordination with other protection devices, such as string fuses and the inverter, so that SPD failure does not create a hazard.
- Short, direct grounding conductors, because cable inductance limits the device’s effectiveness.
Grounding and equipotential bonding
All metal parts, such as structures, frames and enclosures, are connected to an equipotential grounding system. The potential difference between exposed metal parts during a lightning strike is what damages equipment. If a lightning protection system exists, the separation distance from the modules must be evaluated.
What an engineer sees in practice
Devices with a status indicator that changes when they are spent, combiner boxes with SPDs and fuses, and recurring damage to inverter inputs after storms when the design ignored loops and grounding. SPDs are wear items and must be inspected.
When it is not enough
An SPD on its own does not protect against a direct strike; that case is a matter for a lightning protection system. Design and installation on live DC circuits are the responsibility of qualified personnel, in accordance with current electrical regulations.