What the plan is
It is the document that, before anything is tested, states what is going to be demonstrated, how, and by what criterion it will be considered achieved. It avoids later disputes and forces you to think about the product and its use before booking the chamber.
Steps to build it
- Define the product and its configuration, including the hardware and software version to be tested.
- Describe the life cycle: storage, transport, installation and use, with the environments of each stage.
- Identify likely failure modes with a prior risk analysis, to direct the tests at what can really break.
- Choose methods and severities from standards, customer specifications or the real profile.
- Define the sequence: which samples go through which tests and in what order.
- Establish the sample size and its justification.
- Set acceptance criteria for function and inspection.
Points that are often forgotten
Instrumentation and monitoring during the test: without them, an intermittent failure goes unnoticed. The state of the product during exposure, operating or switched off. The baseline measurements taken beforehand. The traceability of the test equipment and its calibration. And what to do when a sample fails: whether it is repaired, analyzed or the program is stopped.
Sample size
A single unit that survives says little about lot variability. The reasonable approach is to base it on risk, cost and, if statistical confidence is wanted, on a reliability model. With few samples, you must be clear about what can be claimed.
How to close the loop
The plan defines the report format: results, deviations, failure analysis and conclusions. It also establishes how later design changes are managed: which ones require tests to be repeated and which do not. A qualification without change control loses validity when the product is modified.
A good indicator
If someone outside the project can read the plan and repeat the test, and if the acceptance criteria need no interpretation, the plan is well written.