How is a start-up test performed on electronic equipment?

The equipment is powered under defined conditions, its power-up sequence is observed with high-speed recording instruments, and inrush current, internal voltages, timing and final state are verified, repeating under various conditions.

What you want to find out

Power-up is the most demanding moment for many types of equipment: capacitors charge, regulators activate, processors initialize and there may be current peaks. A start-up test verifies that this happens in an orderly, repeatable way and without overstress.

What is measured

  • Inrush current: the initial peak as capacitors charge, higher than the steady-state current. It requires a current probe with sufficient bandwidth and an oscilloscope set up to capture single events.
  • Voltage sequence: the order and timing in which the different rails rise, and the reset and power-good signals.
  • Overshoot or dips: at the moment of connection, a rail voltage may overshoot its value or sag under the load.
  • Time to operation: how long it takes to reach the functional state.

Variables to explore

  1. Minimum, nominal and maximum input voltage.
  2. Low and high temperature, at which the timing of regulators and components changes.
  3. Power supply rise rate, which changes with the type of source or switch.
  4. Repeated power-ups and power-ups after a brief interruption, which can leave the equipment in unintended states.
  5. Different capacitor charge states, with the unit cold or just switched off.

What you see in practice

Frequent failures are reset loops if a rail falls below its threshold with the current peak, tripping of the power supply protections, indeterminate states due to incorrect sequencing and differences between a cold start and a warm start.

How to interpret the result

One correct start-up does not demonstrate robustness: it is repetition across the full range of conditions, with comparable records, that gives confidence. Captures are saved with their settings so they can be compared.

When working with mains voltage or high energy, connections and measurements are the responsibility of qualified personnel in accordance with the applicable regulations.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer