24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

How is an EMC pre-assessment carried out in your own laboratory?

With basic instruments: near-field probes, a current clamp, a line impedance stabilization network and a spectrum analyzer. It serves to detect problems and compare corrections, but it does not replace the formal test; margin must be left for uncertainty.

Objective and scope

A pre-assessment makes it possible to discover problems during development, when correcting them is cheap. It does not seek to produce a certifiable value but to answer an engineering question: did this change improve or worsen the behavior?

Useful instruments

  • Spectrum analyzer with preamplifier and peak detector, for quick exploration.
  • Near-field probes, for locating sources.
  • Current clamp, for estimating common-mode current on cables.
  • Line impedance stabilization network, for emissions conducted through the power supply.
  • Antenna and metal plane if a radiated estimate is wanted, accepting that the environment will not be controlled.

Ambient environment: the main obstacle

Outside a chamber, the spectrum contains radio stations, cellular telephony and wireless networks. To distinguish them from the emission of the equipment, measure with the equipment off and on, and compare. A signal that appears and disappears with the equipment belongs to the equipment. Changing the position or switching off the auxiliary equipment also helps.

Recommended practice

  1. Fix a test configuration and document it.
  2. Take a baseline measurement of the initial state.
  3. Change only one thing at a time and repeat the measurement with the same configuration.
  4. Save the spectra for comparison.
  5. Also run basic immunity tests, such as electrostatic discharges with a gun, if you have one and trained personnel.

How to interpret the result

Results obtained outside a validated facility carry greater uncertainty than those from a test laboratory. If a level falls just below the limit, that is not evidence of compliance: a wide margin is sought. If it is clearly above the limit, that is a reliable sign that a problem exists.

It is advisable to repeat the pre-assessment after each relevant design change: a change of reference plane, cable or power supply can alter emissions more than expected.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer