24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

How is equipment prepared for an emissions test?

It is prepared by fixing a representative, reproducible configuration: operating modes that produce the highest emission, cables and peripherals arranged as in normal use, software that exercises all functions and complete documentation of what is being tested.

What preparation aims to achieve

The result of an emissions test is only valid if it represents the real product and can be repeated. Poor preparation produces optimistic results that are not reproduced later, or failures that disappear when a cable is changed. The goal is to put the equipment in its highest-emitting condition within reasonable use.

Define the configuration

  • Operating modes: identify the mode with the most activity (maximum clock speed, active communications, maximum load on power supplies and motors). Sometimes several must be tested.
  • Ports and cables: connect the representative ports with the intended cable types. Length and shielding change the result considerably.
  • Peripherals and auxiliary equipment: use equipment that simulates the load and line ends without generating relevant emissions of its own, and separate or shield it so that it does not contaminate the measurement.
  • Power supply: use the intended voltage and type of source.

Exercise software

Prepare a program or routine that continuously activates displays, memories, communication ports and outputs, in a stable way and without intervention. It must clearly indicate whether the equipment is working or failing, so that it also serves as a reference when moving on to immunity.

Physical arrangement

The applicable standard describes how the equipment is placed (on a table or on the floor), what distance separates it from the ground plane and other objects, and how excess cable is arranged. Follow that arrangement and record photographs and measurements, because small variations alter the result.

What to check first

  1. That the equipment operates without intervention throughout the sweep.
  2. That the cables are the ones defined and are labeled.
  3. That the firmware and hardware versions are recorded.
  4. That the auxiliary equipment is quiet in the frequency range of the test.
  5. That modifications made during the test are noted down, so that they can be reproduced.

A well-prepared test makes it possible to compare results before and after a correction and prevents a setup difference from being mistaken for a design improvement.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer