What is really being measured
The insulation between windings is not a perfect resistor: when DC voltage is applied, a capacitive charging current flows and decays, an absorption current decays more slowly, and a leakage current remains. That is why the resistance reading rises with time and must always be recorded together with the application time.
Measurement combinations
On a two-winding transformer, three paths are measured: high voltage to low voltage, high voltage to ground, and low voltage to ground. In each one, the winding not involved is grounded, or the instrument’s guard terminal is used to divert the currents of no interest. The choice of configuration changes the result, so the one used is documented to allow comparison.
| Path | What it mainly evaluates |
|---|---|
| High to low | Main insulation between windings |
| High to ground | Insulation from the high-voltage winding to the core and tank |
| Low to ground | Insulation from the low-voltage winding to the core and tank |
General procedure
- Confirm that the equipment is de-energized, locked out and has working grounds applied.
- Disconnect bus bars, cables and surge arresters from the bushings; clean and dry the porcelain.
- Short-circuit the terminals of each winding together.
- Select the test voltage according to the insulation class and the recommendations of the manufacturer or the applicable standard.
- Apply the voltage, record readings at defined times, and note the oil or winding temperature.
- When finished, discharge the insulation without haste, for at least as long as the test lasted, before touching any terminal.
Interpretation
A single reading says little. It is compared with earlier tests on the same equipment, with the other paths, and with the ratio between readings at two times, known as the polarization index. Because resistance falls as temperature rises, values are corrected to a reference temperature before being compared.
Common mistakes
- Leaving cables or arresters connected, which add leakage and lower the reading.
- Moisture or surface dirt on bushings being mistaken for insulation degradation.
- Not waiting for readings to stabilize, or not recording the time.
- Measuring at different temperatures and comparing without correction.
- Not discharging the winding: the stored energy can cause injury.
The test uses hazardous voltages and must be performed by qualified personnel, following the applicable safety regulations.