24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

NOM-113-STPS-2009 dielectric testing of boots and protective equipment, Monterrey

We calibrate dielectric boots in our laboratory in Monterrey, using the test methods of NOM-113-STPS-2009.

Dielectric test of boots and protective footwear per NOM-113-STPS-2009

Dielectric boot calibration

We calibrate dielectric boots in our laboratory in Monterrey. We use the test methods established in NOM-113-STPS-2009.

Dielectric protective footwear must withstand the application of 14,000 V AC, at 60 Hz, for one minute, with a leakage current not exceeding 1.0 mA.

Footwear types under the standard

  • Type I, occupational footwear: used in activities where the wearer is exposed only to minor risks, such as cuts, lacerations or knocks against objects, and does not require the special protective characteristics indicated in sections 5.2 to 5.7 of the Standard.
  • Type II, footwear with protective toecap: fully protects the toes where there are impact and compression risks.
  • Type III, dielectric protective footwear: protects against electric shock risks.
  • Type IV, metatarsal protective footwear: protects the instep against direct impact to the metatarsus, in addition to covering the risks of Type II footwear.
  • Type V, conductive protective footwear: dissipates static electricity from the body to the floor, to reduce the possibility of ignition of explosive mixtures or flammable substances.
  • Type VI, penetration-resistant protective footwear: protects the sole of the foot against sharp objects that could pierce the outsole.
  • Type VII, antistatic protective footwear: reduces the buildup of static electricity by dissipating it from the body to the floor, with a resistance high enough to offer limited protection against a possible electric shock.
We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer