What the test measures
An AC voltage is applied to an insulation and the resulting current is measured. An ideal insulation is a pure capacitor and the current leads the voltage by 90 degrees. In a real one there is a small resistive component in phase with the voltage, which represents losses. The power factor is the ratio of that loss component to the total current; the dissipation factor is the tangent of the loss angle. For small values the two are practically equal.
Which configurations are measured
Combinations between high-voltage windings, low-voltage windings and ground are tested separately, as are the bushings, with connection modes that isolate the measurement of each part of the insulation. Each result is associated with a specific portion of the equipment.
How it is interpreted
- Against the reference: factory values or previous tests of the same transformer, under comparable conditions.
- Between phases and between identical units: an isolated deviation draws more attention than a generally high value.
- With temperature correction: dielectric losses depend on temperature, so they are referred to a reference temperature using factors that depend on the type of insulation.
- With the acceptance guides from standards and manufacturers, which should be consulted in their current edition.
What each change suggests
- Increase in power factor: moisture, contamination, aging of the insulation or the oil, or a defect in a bushing.
- Change in capacitance: may indicate movement or deformation of windings, or a fault between layers in a capacitance-graded bushing.
None of these conclusions is definitive on its own: they are checked against oil analysis, insulation resistance and other electrical tests.
How to interpret the result
A rising trend between tests is more informative than a single value. Surface moisture on bushings and in the surroundings can alter the measurement, so weather conditions are noted and the porcelains are cleaned before measuring.
Warning: this test uses high voltage and is performed on de-energized, grounded equipment. It must be carried out by qualified personnel, following the applicable regulations and safety procedures.