How is a site assessed for rooftop panel installation?

Assessing a roof for panels consists of verifying three things: that the structure can bear the weight and the wind loads, that the solar resource is usable without significant shading, and that the building's electrical installation can accept the system.

Structural aspects

The type of roofing and its condition must be known, since not all roofs accept the same anchoring systems. The structure must support the added weight and, often more importantly, the wind forces that lift the array. This review is the task of a person competent in structures, and not merely a visual inspection.

Solar resource and geometry

  • Orientation and tilt: these determine how much energy is captured over the year.
  • Shading from buildings, trees, antennas, rooftop water tanks or parapets, analyzed at different hours and times of year.
  • Usable area, after subtracting walkways, equipment and any clearances required by regulations.
  • Nearby reflective surfaces or sources of dirt, such as chimneys or trees.

The building’s electrical installation

The panelboard, service capacity, protections, grounding and condition of the conductors are reviewed. A photovoltaic system connects to this installation, so any existing deficiency affects safety and operation. The conductor route between the array and the inverter is also defined.

Access and operation

Consider how the equipment will be lifted, how it will be maintained, whether there are power lines nearby and whether there will be work at height requiring fall protection. The location of the inverter, with ventilation and without direct exposure to the sun, influences its performance and service life.

How to interpret the result

The result of the assessment is a set of constraints, not a number. From it, you decide how many modules fit, how they are oriented, what the expected production is and what prior work is needed, such as reinforcement or repairs. If something cannot be resolved, it is best to say so before designing.