24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

How a sample is conditioned before a climatic test

The sample is brought to a known, repeatable initial state, normally at stable ambient temperature and humidity for a sufficient time, with initial measurements recorded, so that the result depends on the test and not on its previous history.

Why it is conditioned

A sample arrives with a history: it may be cold from transport, damp from storage or laden with residues. If the test starts from that state, the result mixes the effect of the test with that of the history. Preconditioning aims to have every sample start from the same reference point.

What it includes

  • Environmental stabilization: keeping the sample under controlled laboratory conditions long enough for its mass to reach thermal and moisture equilibrium.
  • Physical preparation: cleaning, removal of packaging, fitting of connectors and cables, and mounting in the test position.
  • Instrumentation: installation of temperature sensors on the sample and of the means for functional monitoring.
  • Initial measurements: functional, electrical and visual verification, with the values recorded, to establish a baseline.
  • Identification and photographing of the sample before the test.

How long

There is no universal time. It depends on the mass and geometry of the sample, and on whether the material absorbs moisture. The stable condition is verified with sensors on the sample and is not assumed by eye. The applicable standard or specification may set conditions and times, and that is where they should be looked up.

What the engineer sees

An unconditioned sample gives results that do not repeat: a part that arrives cold generates condensation on entering a warm chamber, and one that has absorbed moisture changes in weight, dimensions or electrical properties during the test. The baseline makes it possible to tell afterward whether a change is due to the test.

What to check first

  1. That the sample is free of visible condensation.
  2. That the initial measurements were made at the reference temperature.
  3. That the mounting does not introduce stresses that do not exist in use.
We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer