How is a switching power supply tested?

It is tested by operating it under controlled input and load conditions and measuring its output: regulation, ripple, transient response, efficiency, protections and start-up behavior.

A set of tests, not just one

A switching power supply is characterized by several independent behaviors. Testing moves from static conditions to dynamic ones and, finally, to fault conditions.

What is measured and how

  • Line regulation: variation in the output when the input voltage changes while the load is held constant.
  • Load regulation: variation in the output when the current changes, with the input fixed. A programmable electronic load is used.
  • Ripple and noise: periodic component at the switching frequency and high-frequency spikes. Measured with an oscilloscope, AC coupling, bandwidth limited according to the specification’s criterion and a very short ground connection, because a probe’s long ground lead picks up noise and distorts the measurement.
  • Load step response: droop, overshoot and recovery time when the current changes abruptly.
  • Efficiency: ratio of output to input power, measured with instruments that handle the input waveform correctly.
  • Start-up and shutdown: rise time, overshoot at turn-on and sequence at turn-off.
  • Protections: overcurrent, overvoltage, short circuit and overtemperature, to verify that they act and that the supply recovers as intended.

What you see in practice

Ripple changes with load and with temperature. At light load, some supplies switch to a burst operating mode, with lower-frequency noise. Efficiency depends strongly on the load point. A start-up with overshoot can damage the connected load.

An example sequence

  1. Verify the connections and instrument limits before energizing.
  2. Measure at no load and at different load levels.
  3. Vary the input within its stated range.
  4. Apply steps and observe with suitable triggering.
  5. Induce the protection conditions within safe limits.

Because the input is usually mains voltage, the setup and measurements are the responsibility of qualified personnel following the applicable electrical safety regulations, with suitable isolation of the measuring equipment.