An installation often has several named "grounds": power, instrumentation, communications. The recommended practice is not to keep them disconnected, but to join them in an orderly way so that they work as a single system from the standpoint of potential.
The principle
Two independent grounding systems at the same site can rise to different potentials during a fault or a lightning strike. If a piece of equipment connected to one ground communicates by cable with another connected to a different ground, the potential difference appears across their inputs and can damage interfaces. The solution is to reduce that difference by joining the systems with low-impedance conductors.
How it is done in practice
- A common electrode system is defined, or the existing ones are interconnected with short, low-impedance conductors.
- A distinction is made between the roles of protective ground, signal reference ground and shield ground, without isolating them from the whole.
- A bus bar or reference point is installed, from which the other conductors branch off.
Frequency and topology
At low frequency, a single-point connection avoids circulating current loops through the signal references. At high frequency, long conductors present inductance and perform poorly, so a reference grid with multiple short connections is preferred. Real systems usually combine both criteria according to the frequency range of the signals.
Shields
The shield of a signal cable must be connected according to the type of interference to be countered. Connecting it at both ends protects better at high frequency but allows loop currents if there is a potential difference; connecting it at one end avoids that loop but leaves less protection. The choice depends on the system.
How to interpret a problem
If there is noise on control signals that disappears when a shield is disconnected, the likely cause is a ground loop. The correction is to reduce the potential difference with better bonding, not to isolate blindly. Consult the current standard and the manufacturers’ recommendations; the work must be performed by qualified personnel.