What Does the IEC 60060-1 Standard on High-Voltage Techniques Cover?

The IEC 60060-1 standard sets out general definitions, waveforms, test procedures and requirements for high-voltage test voltages: DC, AC, lightning impulse and switching impulse.

What problem it solves

To compare test results between laboratories, manufacturers and customers, a common language is needed: what exactly a lightning impulse means, how the test value is determined and how the voltage is applied. IEC 60060-1 provides that framework for high-voltage insulation tests.

General content

  • Definitions: terms such as test voltage, disruptive discharge, withstand voltage and peak value, in a consistent manner.
  • Types of test voltage: DC, power-frequency AC, lightning impulse and switching impulse, with the characteristics of each waveform and their tolerances.
  • Test procedures: how the voltage is raised, how many applications are made and how to evaluate whether or not the object withstands, including methods for determining disruptive discharge voltages.
  • Atmospheric corrections: air density and humidity alter the discharge voltage in air, so the standard describes how to refer the results to standard conditions.
  • Requirements for measuring systems: the accuracy requirements and the verification of the measurement are tied to specific complementary standards for measuring systems.

How it is used

A laboratory or a project cites the standard to define how a test is performed and how the results are reported. A test engineer consults it when they need to know whether a generated impulse meets the required shape or how to correct a measurement for the conditions of the day.

When it does not apply

The standard sets out the general techniques; the voltage levels that a specific piece of equipment must withstand are set by that equipment’s product standard. Always consult the current edition and the relevant complementary parts.

These activities involve hazardous voltages: they must be carried out by qualified, authorized personnel, following the applicable regulations and the facility’s lockout and grounding procedures.