What good preparation achieves
A megohmmeter reading is only valid if it measures the insulation you want to evaluate and nothing else. Poor preparation produces low readings from leakage unrelated to the equipment, or damages components that cannot withstand the test voltage. That is why most of the work happens before the button is pressed.
Preparation sequence
- De-energize and lock out. Open the power sources, apply the lockout/tagout procedure and verify with a suitable detector that no voltage is present.
- Ground and discharge. Equipment that has been in service can retain charge in its capacitance.
- Disconnect. Separate the equipment from cables, busbars, potential transformers, surge arresters, capacitors and any sensitive electronics, such as drives or controls, because the test voltage would damage them or distort the reading.
- Clean and dry the surfaces. Dirt and surface moisture create leakage paths that do not represent the internal insulation.
- Choose the test voltage. It must correspond to the rated voltage of the equipment and to the criteria of the manufacturer or the applicable standard; an excessive voltage can damage aged insulation.
- Check the instrument and test leads. Damaged or dirty leads add leakage; it is advisable to verify the instrument before using it.
What to record
Record the equipment temperature, ambient humidity, applied voltage, reading time and state of cleanliness. Without these data it is not possible to correct for temperature or to compare with future measurements on the same equipment.
What to check first if the reading is surprising
An unexpectedly low reading is usually due to something outside the equipment: a cable that is still connected, a contaminated terminal or condensation. Before concluding that the insulation is damaged, rule out these causes and, if there is surface leakage, consider using the guard terminal.
These activities involve hazardous voltages: they must be performed by qualified, authorized personnel, following applicable regulations and the facility’s lockout and grounding procedures.