Setup
A low alternating voltage, much lower than rated voltage, is applied to one winding, normally the high-voltage winding, phase by phase. The other windings are left open, and the current is measured along with, on many instruments, the power. At this reduced voltage, the current mainly reflects the reluctance of the magnetic circuit and the condition of the windings, not saturation in operation.
Order of execution
- Record the nameplate data, the tap changer position and the temperature.
- Perform the test before injecting direct current, as in the winding resistance test, because that leaves residual magnetism that alters the reading.
- Measure the three phases at each relevant tap changer position, or at the nominal position and the extremes.
- On delta windings, measure at the appropriate terminal combination, with the other terminals in the condition indicated by the procedure.
What to expect
In three-phase, three-leg transformers, the center-leg phase usually shows lower current than the outer phases, which are similar to each other. This pattern is normal and serves as the reference. In five-leg transformers or other constructions the patterns change, so the comparison is made with identical units or with the unit’s own history.
What deviations indicate
- One phase with current very different from the pattern: there may be shorted turns, damaged laminations or a core connection problem.
- Changes between tap changer positions that do not follow the design logic: faulty tap changer contacts or connections.
- Different values after a move or a repair: displacement of the core or structure.
- Inconsistent readings between repetitions: residual magnetism.
How to interpret the result
The relationship between phases and the comparison with previous measurements, made with the same instrument and the same voltage, are evaluated. An isolated value with no reference says little. The results are checked against those of the ratio, resistance and frequency response analysis tests before reaching a conclusion.
The test is performed with the transformer de-energized and isolated, by qualified personnel.