Definition
Each load has its own maximum demand, which is its peak over a period. Coincident demand is the peak of the sum of all of them over time, that is, the maximum load the group simultaneously places on the common feeder or transformer. Since not all the peaks coincide, this value is less than or equal to the sum of the individual peaks.
Coincidence and diversity factors
The coincidence factor is the coincident demand divided by the sum of the individual maximum demands; it cannot be greater than one. Its inverse is called the diversity factor and cannot be less than one. The more the operating schedules of the loads differ, the lower the coincidence factor.
A qualitative example
A process line that runs during the day and a cooling system that runs mostly at night each have a high peak, but at different hours. If the common transformer is sized for the sum of both peaks, it ends up oversized. If, on the other hand, a coincidence that does not exist is assumed, it ends up undersized and overloaded.
What it is used for
- Sizing transformers, feeders and generators that serve several loads.
- Planning expansions: knowing how much real capacity is still free.
- Analyzing billable demand and strategies for reducing peaks by shifting loads in time.
How it is obtained
The reliable way is to measure all the loads of interest at the same time, with synchronized records and a defined integration interval, and add them point by point. It is not enough to add the individual maximum demands recorded by each meter, because the information about when each one occurred is lost. If no measurements are available, typical published factors for each type of load are used, taking care to recognize their uncertainty.
How to interpret the result
A coincident demand close to the sum of the peaks points to loads that operate together, and sizing must be based on that case. A much lower value indicates diversity that can be exploited, but also that a change in schedules or process can alter it and make the capacity insufficient. It is therefore advisable to review it when operations change.