What it is for
Winding resistance reveals poor connections, shorted turns in extreme cases, and differences between phases due to repairs or damage. Because the values are low, the measurement must prevent the resistance of the test leads from distorting the result.
Method
- With the motor de-energized, disconnected from its supply, locked out and discharged, open the terminal box.
- Record the temperature of the windings, or that of the motor if it has been stopped long enough to equalize with ambient.
- Use a micro-ohmmeter or low-resistance ohmmeter with a four-wire connection, or a suitable bridge.
- Measure between pairs of terminals: U-V, V-W and W-U. Let the reading stabilize, because the inductance of the winding makes the current take time to reach its final value.
- Repeat and record.
How to read what is measured
What is measured between two terminals depends on the internal connection. In a wye connection, there are two windings in series between two terminals. In a delta connection, there is one winding in parallel with the other two in series between two terminals. For this reason, the per-phase resistance is deduced with the ratio corresponding to the connection, or the three measurements are compared directly.
Temperature correction
The resistance of copper increases almost linearly with temperature, according to its thermal coefficient. To compare measurements taken at different times, or against the factory value, they are converted to a reference temperature using the copper relationship. Measuring a motor that has just been running, while it is still hot, without correcting, leads to wrong conclusions. This same dependence is used to estimate the temperature rise of a winding from the change in its resistance.
How to interpret the result
- The three measurements should be very similar to one another. A notable difference points to a loose connection, a damaged winding or a repair error.
- An increasing trend over time signals deterioration of joints.
- The test does not detect all insulation defects; it is complemented by insulation resistance and other tests.
Acceptance criteria and the tolerance for differences between phases come from the manufacturer’s documentation and applicable standards. The tests are performed by qualified personnel.