What is the Código de Red and what does it cover on power quality?

The Código de Red, Mexico's grid code, is the set of Mexican technical provisions on planning, operation and connection that establishes the efficiency, quality, reliability, continuity and safety criteria of the National Electric System. On quality, it sets requirements for voltage, frequency, harmonics and power factor.

What it is

The Código de Red is a technical regulation issued by the electricity sector authority in Mexico under the relevant legislation. It brings together the criteria that must be met by those who operate, use or connect to the National Electric System, in order to maintain the reliability and quality of supply. It is not a product standard or an installation manual: it is a set of requirements for system operation.

What it covers on quality

In general terms, it addresses the parameters that characterize power quality at the point of connection and establishes measurement and compliance obligations. The topics it covers include:

  • Voltage and frequency variations in operation.
  • Voltage and current harmonic distortion.
  • Flicker.
  • Voltage unbalance.
  • Users’ power factor.

It also covers planning, requirements for connecting power plants and load centers, and system operation, which go beyond quality.

Who it is aimed at

It applies to different participants: generators, transmission companies, distributors and connected end users, with requirements that vary by type, size and connection voltage level. So before applying a criterion, you need to identify which category the installation falls into.

What an engineer sees in practice

It translates into connection studies, power quality measurements at the point of connection and tracking of indicators. Compliance is demonstrated with measurements made by recognized methods over defined recording periods, evaluated against the criteria in the document.

What to do with this summary

This guide gives only the general scope. Numerical limits, evaluation periods, deadlines and procedures change with updates and the associated manuals. Before using a specific value, consult the current version published by the competent authority and, if there are doubts about interpretation, ask the authority or the grid operator.