How do you trace the origin of a voltage sag: upstream or downstream?

Whether a voltage sag originates upstream or downstream of the measurement point is inferred by comparing the sag with the behavior of the current: if more current flows toward the load during the event, the fault is downstream; if the current drops or does not rise, it is upstream.

The basic logic

A sag caused by a fault occurs because a large current flows toward the fault point. If the analyzer is between the source and the fault (the fault is downstream), the measurement shows the voltage falling and the current rising, with flow toward the fault. If the fault is on the source side (upstream), the analyzer sees the voltage fall, but the load current decreases or at most does not rise, because the load is receiving less voltage.

What is compared

  • Current magnitude at the start of the event: a sharp upward step indicates a downstream fault or a motor start inside the installation; a drop suggests an upstream origin.
  • Power direction at the start: methods based on active and reactive power, or on the apparent impedance, detect whether the initial flow is toward the load or toward the source.
  • Synchronization between several points: the equipment closest to the fault will see the deepest sag.

Watch out for ambiguities

Motors and other loads with inertia can feed current back into the grid during a sag, which changes the expected sign. Transformers with certain connections change the number of affected phases and their magnitude from one side to the other. The methods work better with synchronized waveform records and several points than with a single RMS reading.

What an engineer sees in practice

An event log that stores only RMS values is usually insufficient: waveform capture with a few cycles before and after the trigger is preferable. When reviewing the event, voltage and current in all three phases are examined during the first cycles and cross-checked with protection records and with the time of operations at the plant or substation.

How to use the conclusion

If the origin is upstream, the solution involves strengthening load immunity or providing backup, and coordinating with whoever operates the grid. If it is downstream, it is corrected inside the installation: starting sequence, type of motor starting or protection coordination. Installing sensors in energized panels requires qualified personnel.