Safety, calibration and quality procedures in liquid nitrogen testing

How we run tests with cryogenic supply: safety controls, traceable calibration and the documentation delivered to the customer.

Liquid nitrogen test chamber

Tests with cryogenic supply

Tests with cryogenic supply require strict safety procedures and quality controls. Here we describe how we operate, how we maintain traceability and what controls we apply to protect equipment and personnel.

Operational safety

  • Personnel trained and authorized to handle liquid nitrogen and cryogenic systems.
  • Written procedures for filling, emptying, purging and emergencies.
  • Specific personal protective equipment: cryogenic gloves, face shields and thermal clothing.
  • Monitoring of oxygen concentration in the room and adequate ventilation.
  • Signage and access controls for test areas.

Calibration and traceability

  • Temperature and humidity sensors calibrated with traceability to national standards.
  • Periodic verification of the performance of the Sun EC01 chamber and the ETS controllers.
  • Calibration of electrical instrumentation (VNA, LCR, multimeters, oscilloscopes) according to quality programs.
  • Data quality assurance and traceability: records, backups and version control.

Contingency plans

  • Procedures for loss of vacuum or nitrogen system failure.
  • Electrical hazards mitigated with insulation and safe cable routes.
  • Incident response plans for personnel and equipment.

Documentation and certificates

  • Each test includes a documentation package with calibration certificates, the SOP for the procedure performed, environmental records, data files in open format (CSV) and a complete technical report.
  • We can issue certificates of compliance with the standards the customer requests.