24/7 emergencies 814 777 6921812 230 6079WhatsApp 811 786 0768
Electrónica MonterreyElectrónica MonterreyLaboratorios Creativeit Talk to an engineer
Menu

Calibration of Dielectric Boots with Water Hipot, ASTM D120, Monterrey

We calibrate insulating dielectric boots and gloves with a water hipot test, for companies that must verify their electrical protective equipment.

Water hipot equipment for calibrating dielectric boots

Calibration of dielectric boots and gloves

We calibrate insulating dielectric gloves and boots in accordance with the test and calibration procedure for insulating dielectric boots and gloves, and taking user feedback into account.

The process is completed automatically. The equipment reads the leakage current of each test item and the data are printed automatically. This replaces the irregular method used previously, simplifies procedures and increases test speed. It also identifies leakage current, power-frequency withstand voltage and other parameters more reliably.

Main equipment features

  • Tests 6 items at the same time.
  • Reads the leakage current of each item to accurately identify those that are unfit.
  • The test cart has wheels on the bottom for easy movement.
  • Large display that stays visible under bright light.
  • One-click operation.

Insulating glove testing

Safe use of Class 00, 0, 1, 2, 3 and 4 electrical gloves

Improper use of rubber insulating electrical gloves can be a matter of life or death. Have them retested regularly to confirm that they are still electrically safe.

If well cared for, rubber insulating gloves can last a long time. Testing helps prevent failures that could lead to electric shock when wear has affected the integrity of the surface.

Companies regularly ask for care and maintenance advice so that their gloves provide continuous electrical protection. We perform the necessary tests to verify whether your gloves are fit for service.

We do real tests, on video! Watch them on our YouTube channel →

Do you have a problem nobody has been able to measure?

Talk directly to the engineer in charge, with no middlemen.

Talk to an engineer